Ihr Browser ist veraltet. Bitte aktualiseren Sie auf Edge, Chrome, Firefox.

Into the Wild

Year of construction
2021/22
Level of difficulty
blue
Total length
2.8km
Ø-Gradient
12%

The Into the Wild Trail invites to immerse yourself in the wild landscape of the Goms through a wonderful canvas of terrain! The hand-built single trail is surrounded by glowing larch forests, lush meadows and blueberry fields and therefore has all the ingredients for an impressive nature and landscape experience. Thanks to the low level of difficulty, it is perfect for gaining initial experience on narrow single trails and coming into contact with easy-to-roll stone fields and root sections.

#singletrail #supernatural #wild #viewsfordays
Ride through fields of Blueberries right after the start. Breathtaking views of the Goms Valley
Challenging Option: Rock Slab Ride, Main Line on the inside is rollable
Switchback Turn
Trail Design with smooth changes in direction and rolling contours drainages
Flow along the forrest
Open wood section
With flow along the woods. Rock formations adjust the speed and rhythm.

A low-threshold yet natural single trail

The Into the Wild Trail meets the great need for natural trails and a genuine landscape experience, which is also repeatedly expressed in various user surveys. With its easy level of difficulty, it makes this nature experience accessible to a large group of mountain bikers. Conceptually, it ideally complements the Forest Bump Trail, as it is at a similar level of difficulty, but is clearly different in terms of character and standard of construction. In addition to these low-threshold passages, there are also short flat sections and small counter-climbs, which provide a change of pace and space to catch your breath and enjoy nature.

 

Claudio Della Bianca, CEO Bellwald Tourismus

The Into the Wild Trail makes a significant contribution to differentiating the bike park offering. In terms of trail character, it takes a completely different approach to the Forest Bump Trail, but after the first test rides I am convinced that it will be just as successful!

Moving images of the construction phase in summer 2022 of the first trail section, which leads through the impressive terrain with breathtaking views to the Goms.

 

Edit: Severin Schindler
Shots: Levi Luggen

 

Mike Dargel, former Trail Builder at Vast (2021-2023)

On the Into the Wild Trail, we were shoveling and picking every day with full vigor. With the best view ever, the motivation was always high! Creating a flowing single trail by hand in this terrain was a great experience!

Year of Construction

2021/22

Contractor / Client

Verein Bike Park Bellwald

Vast Services

Trail Design, Construction

Ø-Gradient

12%

Level of Difficulty

Main Line blue with red options

Project Partner

Plan A+ AG, Brig